Commercial silicone partner program

Give price-stalled replacement bids a second path to revenue.

When a commercial owner cannot justify a full tear-off, give them another credible path. Submit the roof to Accurate. If it qualifies, we prepare a turnkey silicone restoration price for your company, perform the field work and support the closeout. You present the solution at your price and retain the agreed project spread—without building a coatings division.

Submit a commercial roof See the partner economics
For eligible flat and metal commercial roofs. Final scope, pricing, responsibilities and payment are controlled by the signed project and partner terms.
White silicone coating on a commercial roof

One roof. Two prices. One clear commercial model.

Accurate provides a project-specific partner price only after the commercial roof qualifies. Your company presents the customer-facing proposal within the approved program structure.

This is a project-level fulfillment relationship, not a blanket margin promise. Accurate first reviews the commercial address, existing roof assembly, measurements, moisture and repair needs, access, territory and production fit.

The accepted documents then define X, the included field scope and closeout responsibilities. The roofing partner controls its approved customer proposal and selling activity under the partner terms. The partner remains responsible for its own expenses, taxes, commitments and customer communications.

Y minus X is an indicative gross project spread only after the customer accepts, the project is completed and payment obligations are satisfied.

The strongest handoff starts before a replacement proposal is lost. The partner submits the commercial address, building use, current roof system if known, approximate size, photographs, leak or moisture history, access constraints, customer objective and the price obstacle.

Accurate can then determine whether the roof warrants further silicone qualification, what testing or repairs may be required and whether the territory and production schedule fit.

No customer-facing restoration promise should be made until the accepted scope, responsibilities, partner price and closeout path are documented for that project.

X = Accurate fulfillment price

The project-specific partner price for the verified scope, defined inclusions and approved service territory.

Y = Your customer price

The commercial restoration price your company presents under the current partner agreement.

Y − X = indicative gross project spread

The potential spread before your selling expense, taxes and other obligations. It is not guaranteed profit.

You found the customer. Do not let replacement price kill the deal.

01

Bring the stalled bid

Start with a commercial replacement opportunity the owner cannot justify on price.

02

Screen the roof

Send photos, measurements, records and access details so Accurate can evaluate restoration eligibility.

03

Receive partner price

Accurate verifies the scope and issues the project-specific fulfillment price under current program terms.

04

Sell; Accurate fulfills

You present the restoration option at your approved price; Accurate performs the accepted field scope and closeout.

A deal-rescue operating system.

One workspace to submit price-stalled commercial roofs, track eligibility, review the Accurate partner price, prepare your customer proposal and follow fulfillment through closeout.

Preview the deal-rescue workspace
Partner workspaceDemonstration

Price-stalled opportunities

Riverview Logistics CenterDraftPinewood Office ParkSubmittedLakeside DistributionEstimating
Your companyAccurate Roof Systems

Commercial silicone roof restoration.

Your local relationship. Accurate behind the restoration system.

Request a roof evaluation
Approved partner pages publish only after relationship and content verification.

Your customer relationship. Accurate behind the field execution.

After the economic model is approved, each accepted contractor can receive a dedicated page to educate commercial decision-makers, capture building details and route the opportunity to the right team.

  • Verified company, market and contact information
  • Local lead capture and source attribution
  • Accurate-supported silicone education and qualification
  • Versioned approval before publication

Co-branded partner examples.

The public overview uses neutral examples. Named prospect demonstrations remain separate, no-index concepts until a relationship and every public claim are approved.

Approval required before publication

Accurate handles the accepted field scope, soup to nuts.

Training and orientation

Help account teams recognize candidate roofs, gather the right evidence and explain where silicone fits.

One project intake

Photos, measurements, roof type, building details and contact information enter one trackable handoff.

Qualification and partner price

Accurate verifies the roof, defines the accepted restoration scope and issues the project-specific partner price.

Lead routing and attribution

Dedicated page submissions retain the contractor, market and campaign source so follow-up has an owner.

Turnkey fulfillment and closeout

For accepted projects, Accurate coordinates mobilization, preparation, repairs, silicone installation, quality documentation and closeout under the written responsibility matrix.

Before you apply.

The program is a project-fit and relationship workflow—not a promise that every roof, market or contractor will be accepted.

Who is the program built for?

Roofing contractors with commercial flat or metal roof opportunities—especially replacement bids that stall because the owner cannot justify the tear-off price.

What does the contractor handle?

The contractor brings the commercial opportunity, shares the available roof information, presents the approved solution and remains the relationship lead under the written partner terms.

What does Accurate handle?

For accepted projects, Accurate supports technical eligibility review, field verification, final scope, partner pricing, mobilization, preparation, repairs, silicone installation, quality documentation and closeout as defined in the signed responsibility matrix.

How does the partner make money?

Accurate provides an approved project-specific partner price. The contractor presents the customer price within the program structure and may retain the agreed gross project spread after successful completion and payment. The spread is not guaranteed profit and partner expenses still apply.

Is every roof eligible for silicone?

No. Roof condition, moisture, substrate, drainage, details and the existing assembly must be evaluated before restoration is recommended.

Does the co-branded page automatically create a backlink?

No. A backlink is created only when the contractor voluntarily links from its own website to the dedicated page. Links should be visible, useful and placed in relevant service content.

When does a demonstration page become public?

Only after the contractor relationship, business information, territory, claims, routing and page copy are approved. Prospective demonstrations remain no-index.

Is replacement price about to kill a commercial bid?

Send the roof to Accurate. We will evaluate whether a qualified silicone restoration option can turn a stalled replacement opportunity into a viable project.

Send the roof to AccuratePreview the deal-rescue workspace

Commercial decision guide · Reviewed August 31, 2026

Turn a price-stalled bid into another viable path.

The Accurate Roof Systems contractor-partner program gives roofing contractors a structured way to evaluate eligible commercial roofs when a replacement opportunity stalls on price. The contractor brings the customer relationship and available building information. Accurate reviews the roof, territory, and production fit, then defines a project-specific silicone restoration scope and partner price only when the opportunity qualifies. For accepted work, responsibilities for proposal, field fulfillment, documentation, payment, and closeout are set in writing.

01 / field guide

Use the program for a defined commercial problem

A strong opportunity usually begins with a commercial flat or metal roof for which the owner is considering replacement but cannot justify the current price, disruption, or timing. The contractor may need another condition-based option to keep the conversation moving. Silicone restoration can enter that comparison only if the existing assembly is sufficiently sound, compatible, and repairable. The owner’s objective and the reason the replacement proposal stalled should be documented at intake.

The program is not a method for relabeling every old roof as a coating project. Active leaks, wet insulation, failed decking, unstable materials, incompatible surfaces, poor drainage, and deficient details can narrow or eliminate restoration. Repair, recover, replacement, or no immediate project may remain the responsible path. Contractors protect their credibility by presenting the review as an eligibility process rather than promising a lower-priced system before the evidence exists.

02 / field guide

Build the handoff from verifiable roof information

Useful intake information includes the commercial address, building use, customer contact and decision status, known roof system, approximate size, measurements, photographs, leak or moisture history, prior repairs, access, occupied hours, rooftop equipment, and original proposal context. Plans, warranty records, core information, or moisture reports can improve the review when available. Assumptions should be labeled, and customer records should be shared only with proper authorization.

Accurate can use the initial record to decide whether the opportunity warrants further qualification and what is missing. Field verification may include measurements, moisture investigation, adhesion testing, detail quantities, substrate review, and production planning. Territory and current capacity also matter. A technically promising roof is not an accepted project until the address, scope, schedule, roles, and commercial terms fit and the required documents are approved.

03 / field guide

Define roles, pricing, and customer communication

For an accepted project, the responsibility matrix should state who controls the customer proposal, who performs technical review, who supplies measurements and records, who completes field work, and who handles change conditions, collections, documentation, and closeout. Accurate’s project-specific fulfillment price reflects the verified included scope. The contractor’s customer-facing price operates within the approved program structure and its own responsibilities. Neither number should be presented before its underlying assumptions are understood.

The difference between a customer price and fulfillment price is an indicative gross project spread, not guaranteed profit. Selling expense, taxes, financing, customer concessions, extra work, delays, and other contractor obligations can affect the final result. The contractor should avoid fixed-margin claims and should not describe Accurate’s price as a public retail quote. Written terms control payment events, change authorization, and what must happen before any spread is earned.

04 / field guide

Carry an accepted project through documented closeout

Once accepted, the field plan should address preparation, wet-area or damaged-material response, repairs, details, primer or reinforcement when required, coating application, access, safety, weather, occupied operations, and quality records. The contractor and Accurate need one source of truth for customer decisions and scope changes. No one should promise a completion date or building outcome that the approved schedule, roof condition, and project documents do not support.

Closeout should show the completed scope, material and application records, photographs, exclusions, unresolved items, customer communications, and maintenance expectations. Branding and public partner references also require approval; a private review does not authorize logos, a public directory listing, or claims of certification. Future opportunities still require roof and territory review. A good program relationship is repeatable because each project remains specific, documented, and honest about what has and has not been confirmed.

CallCommercial assessment